Industrial Descaling Specialist
Turbo Solution Co., Ltd.
Eco-friendly, Cost-effective Solution You Can Trust
Turbo Solution Co., Ltd.
Eco-friendly, Cost-effective Solution You Can Trust
1. Installed Model : Two units of SRD-1000A
2. Main equipment : Cooling towers (1000RT x 3 units)
3. Operation Started: 2019.8.5
4. Checkup Date : 2019.8.30
Scales collected by the SRD-1000A units after 25 days of operation.
Photos below show the change on the drift eliminator surface checked after 35 days of operation.
Scale removed after 5 months of operation.